  • 14 storeys — tallest building we have infilled (Hathaway House, London W9)
  • 8 storeys — tallest standalone structure built entirely in SFS, with no primary concrete or hot rolled frame (Perrymount Road, Haywards Heath)
  • 54 flats — largest single residential scheme, delivered for Croydon Council (Russell Hill, Purley)
  • 2,000m2 — largest single SFS and boarding package, installed in 6 weeks by 4 operatives (The Lea, Denham)
  • 18 metres — longest studs erected, from MEWPs by electric hoist (Lea Field Way, Bolton)
  • 120 minutes — highest fire rating achieved, double the common UK specification (Fulham Gas Depot)
  • 25 blocks — largest repeating programme, at 2 weeks per block with students in residence (Seething Wells Campus, Kingston)
  • 3 weeks — fastest complete package handover (South Plaza Bristol; Morasha School, Finchley)

We work across SFS infill, stick-build full builds and panellised full builds, for main contractors, developers, local authorities and universities — in London, the South East and across the UK.

Completed projects at a glance

Project Location System Scale Client Duration
Fulham Gas Depot Imperial Road, London SW6 Infill 120-minute fire rating Erith 6 weeks
Russell Hill Purley, London CR8 Stick-build full build 7 storeys, 54 flats Selsdon Building Contractor / Croydon Council 18 weeks
Perrymount Road Haywards Heath, West Sussex Panellised full build 8 storeys, standalone We Build 18 weeks
Hathaway House Elmfield Way, London W9 Infill 14 storeys mixed-use + 4-storey office HG Construction 12 weeks
The Great Wall of Bolton Lea Field Way, Bolton BL5 Acoustic infill 18-metre studs Conamar Building Services 8 weeks
Cross Keys Edmonton, London N9 Stick-build rooftop 8 flats on an occupied 6-storey block Forts Group 12 weeks
Albany Court Trenmar Gardens, London NW10 Stick-build rooftop 6 flats, 3-level tiered roof Forts Group 8 weeks
Seething Wells Campus Kingston upon Thames KT6 Stick-build rooftop 25 blocks, 2 weeks each Engie 24 months
The Lea, Denham Uxbridge UB9 Infill, full package 2,000m2, 4 operatives Private client 6 weeks
Bayard Place Peterborough PE1 Stick-build rooftop 2 storeys on a 6-storey building Brightfield Group 18 weeks
56 Chatfield Road Wandsworth, London SW11 Frameclad extension 4 storeys added Landmark Estates 10 weeks
Block B Grays Place, Slough SL2 SFS + structural steel 5 storeys, steel pitched roof 4Square 14 weeks
South Plaza Bristol BS1 Stick-build rooftop 1 storey, CP board Dako Construction 3 weeks
Morasha School Finchley, London N3 Infill to HRS frame Full external envelope Private client 3 weeks

Repeat appointments: Forts Group returned for a second rooftop extension after Albany Court; Erith and Dako Construction have both continued working with us since their first project.

Infill

Infill is the largest part of our portfolio. These are non-load-bearing walls of cold-formed steel fixed between the floors of a concrete or hot rolled steel frame — carrying cladding, sheathing and wind load, but not the building’s weight.

The projects below run from a 120-minute fire-rated façade at the former Fulham Gas Depot for Erith, to a 14-storey mixed-use tower in west London built with no site storage at all, to an acoustic wall of 18-metre studs separating offices from military weapons storage in Bolton.

Read more about our SFS infill walling system.

Denham Crematorium

Denham Crematorium – Uxbridge

BAS Frames installed over 2,000m2 of SFS and external boarding at The Lea, Denham near Uxbridge, inside a 6-week programme — with a team of just 4 operatives, working entirely from scissor lifts at first-floor level. This is one of the few commercial schemes where the client appointed BAS Frames to deliver the full SFS […]

Steel frame construction on a BAS Frames project

Cross Keys Rooftop Extension

BAS Frames built 8 new flats on the roof of an occupied 6-storey block at Cross Keys, Edmonton N9, using a stick-build steel frame with joists lifted into place by hand — completed in 12 weeks. Cross Keys was the second rooftop extension Forts Group awarded to BAS Frames, following Albany Court in Trenmar Gardens. […]

Structural steel frame interior on a BAS Frames project

Albany Court Rooftop Extension

BAS Frames built a 6-flat rooftop extension at Albany Court, Trenmar Gardens NW10, using a stick-build steel frame assembled in place above occupied flats — completed in 8 weeks with no delivery rejected. Forts Group appointed BAS Frames to add 6 new flats to the roof of an existing residential block in north-west London. Residents […]

Fulham Depot sfs design

Fulham Imperial Road GAS Depot

BAS Frames designed, supplied and installed SFS infill achieving a 120-minute fire rating at the former Fulham Gas Depot on Imperial Road SW6 — double the industry standard, delivered for Erith in 6 weeks. A demolition contractor moving into building works St William acquired and managed the Imperial Road site. The gas depot building itself […]

Completed structural steelwork at the 56 Chatfield Road project in London

56 Chatfield Road

BAS Frames added 4 storeys to an existing residential building at 56 Chatfield Road, Wandsworth SW11, on the bank of the River Thames — working from incomplete architect’s drawings and spotting a scaffold tie clash that would have cost the client significantly if it had been found later. Delivered in 10 weeks. The client was […]

Large structural steel frame at the Bolton project

The Great Wall of Bolton

BAS Frames installed a high-rise SFS acoustic infill system at Lea Field Way, Bolton, separating office areas from military weapons storage in a UK defence warehouse — with 18-metre studs erected by electric hoist from MEWPs, in 8 weeks. Working for Conamar Building Services in partnership with Steel Frame Solutions, BAS Frames handled installation and […]

Structural steel frame construction at the Hathaway House project

Hathaway House, Paddington

BAS Frames delivered the SFS infill package to a 14-storey mixed-use tower and a 4-storey office building on Elmfield Way in west London, working with zero on-site storage and a just-in-time delivery regime, for HG Construction in 2018 over 12 weeks. The scheme combined residential and commercial space in a 14-storey tower alongside a separate […]

Structural steel frame construction at the Finchley school project in London

Morasha School, Finchley

BAS Frames formed all external walls and window openings in SFS around a hot rolled steel frame at Morasha Jewish Primary School in Finchley N3, clad externally in CP board — the complete external envelope delivered in under 3 weeks in 2018. The main structure was built in hot rolled steel (HRS). Our scope was […]

Panellised

Panellised construction delivers wall and floor panels built in a factory as flat, complete units, then assembled on site. It is not modular: modular means finished three-dimensional room units craned into place, which is a different product with different site requirements.

Perrymount Road in Haywards Heath is an 8-storey standalone building constructed entirely in light gauge steel, with no primary concrete or hot rolled frame — among the tallest of its kind in the UK. The design was signed off over 3 months before a single fabrication drawing was issued, because a panel made to a superseded drawing cannot be trimmed to fit.

Read more about our panellised steel frame system.

Insatall

Perrymount Road

Perrymount Road in Haywards Heath is an 8-storey standalone building constructed entirely in light gauge steel — one of the tallest buildings in the UK delivered as a panellised SFS full build with no primary concrete or hot rolled steel frame. Most steel framing systems on a building this height sit as infill inside a […]

Stick Build

Stick-build means assembling the frame on site, component by component, rather than lifting in prefabricated panels. It is the method for sites panels cannot reach: occupied buildings, restricted craneage, complex geometry, or an existing structure where the as-built never quite matches the drawing.

That is why it dominates rooftop and airspace work. Below: 54 flats over 7 storeys for Croydon Council at Purley; 25 student blocks extended at 2 weeks each, using a single forklift with students in residence; and a 5-storey building in Slough topped with a stick-built steel pitched roof and individually formed dormer windows.

Read more about our stick-build steel frame system.

Insatall

Russell Hill, Purley

BAS Frames delivered a 7-storey steel frame full build providing 54 flats for Croydon Council on Russell Hill Road, Purley — taking over a scheme after another contractor had left the ground floor with defects, and completing it through the COVID-19 pandemic in 18 weeks. The scheme replaced 7 detached houses near Purley Station with […]

Structural steel frame construction at the Peterborough project

Bayard Plaza, Peterborough

BAS Frames delivered a 2-storey steel frame full build on the roof of the former Peterborough City Council offices at Bayard Plaza, Broadway, forming the penthouse level of a 102-apartment office-to-residential conversion — built through a winter of rain, snow and high winds in 18 weeks. The client was Brightfield Group. The wider scheme converted […]

Steel frame building at the Kingston University project

Kingston University Student Blocks

BAS Frames delivered SFS rooftop extensions and standalone steel kitchen and common room structures across 25 student accommodation blocks at Seething Wells Campus, Kingston upon Thames — completing each block in 2 weeks, with students living on site throughout. Working for Engie over a 24-month programme, each of the 25 blocks was renovated and extended […]

Steel frame building at the Bristol Study Inn student accommodation project

Study Inn, Bristol

BAS Frames delivered a single-storey rooftop full build with CP board external walls at South Plaza, Bristol, in 3 weeks — scheduling every crane lift at weekends to avoid the cost of weekday high-street closures for Dako Construction and Study Inn. Completed in 2018, this was one of the first projects Dako Construction ran as […]

Steel framework erected for Block B at the Slough development

Block B, Slough

BAS Frames delivered a 5-storey building at Grays Place, Slough, combining Steel Frame Systems with structural steel and topped by a stick-built steel pitched roof with individually formed dormer windows — completed in 14 weeks in 2018, with a telehandler as the only lifting plant. Working for 4Square in partnership with Steel Frame Systems, BAS […]

GET IN TOUCH

In order to get in touch, complete the contact form, or see our details below.

Address: BAS CONSTRUCTIONS LTD
35 Redcliffe Close,
London,
SW5 9HY
Opening times: Mon to Fri – 08:00 – 17:00 Saturday and Sunday and Bank Holidays Closed.

Call: 07463 631303
office@basframes.co.uk

This field is for validation purposes and should be left unchanged.
Name(Required)

Menu