Ongoing Project

Large structural steel frame at the Bolton project

The Great Wall of Bolton

BAS Frames installed a high-rise SFS acoustic infill system at Lea Field Way, Bolton, separating office areas from military weapons storage in a UK defence warehouse — with 18-metre studs erected by electric hoist from MEWPs, in 8 weeks. Working for Conamar Building Services in partnership with Steel Frame Solutions, BAS Frames handled installation and […]

Insatall

Russell Hill, Purley

BAS Frames delivered a 7-storey steel frame full build providing 54 flats for Croydon Council on Russell Hill Road, Purley — taking over a scheme after another contractor had left the ground floor with defects, and completing it through the COVID-19 pandemic in 18 weeks. The scheme replaced 7 detached houses near Purley Station with […]

Structural steel frame construction at the Peterborough project

Bayard Plaza, Peterborough

BAS Frames delivered a 2-storey steel frame full build on the roof of the former Peterborough City Council offices at Bayard Plaza, Broadway, forming the penthouse level of a 102-apartment office-to-residential conversion — built through a winter of rain, snow and high winds in 18 weeks. The client was Brightfield Group. The wider scheme converted […]

Steel frame building at the Kingston University project

Kingston University Student Blocks

BAS Frames delivered SFS rooftop extensions and standalone steel kitchen and common room structures across 25 student accommodation blocks at Seething Wells Campus, Kingston upon Thames — completing each block in 2 weeks, with students living on site throughout. Working for Engie over a 24-month programme, each of the 25 blocks was renovated and extended […]

Structural steel frame construction at the Hathaway House project

Hathaway House, Paddington

BAS Frames delivered the SFS infill package to a 14-storey mixed-use tower and a 4-storey office building on Elmfield Way in west London, working with zero on-site storage and a just-in-time delivery regime, for HG Construction in 2018 over 12 weeks. The scheme combined residential and commercial space in a 14-storey tower alongside a separate […]

Structural steel frame construction at the Finchley school project in London

Morasha School, Finchley

BAS Frames formed all external walls and window openings in SFS around a hot rolled steel frame at Morasha Jewish Primary School in Finchley N3, clad externally in CP board — the complete external envelope delivered in under 3 weeks in 2018. The main structure was built in hot rolled steel (HRS). Our scope was […]

Steel frame building at the Bristol Study Inn student accommodation project

Study Inn, Bristol

BAS Frames delivered a single-storey rooftop full build with CP board external walls at South Plaza, Bristol, in 3 weeks — scheduling every crane lift at weekends to avoid the cost of weekday high-street closures for Dako Construction and Study Inn. Completed in 2018, this was one of the first projects Dako Construction ran as […]

Steel framework erected for Block B at the Slough development

Block B, Slough

BAS Frames delivered a 5-storey building at Grays Place, Slough, combining Steel Frame Systems with structural steel and topped by a stick-built steel pitched roof with individually formed dormer windows — completed in 14 weeks in 2018, with a telehandler as the only lifting plant. Working for 4Square in partnership with Steel Frame Systems, BAS […]