Load Bearing Full Build (Stick Build)

Insatall

Russell Hill, Purley

BAS Frames delivered a 7-storey steel frame full build providing 54 flats for Croydon Council on Russell Hill Road, Purley — taking over a scheme after another contractor had left the ground floor with defects, and completing it through the COVID-19 pandemic in 18 weeks. The scheme replaced 7 detached houses near Purley Station with […]

Structural steel frame construction at the Peterborough project

Bayard Plaza, Peterborough

BAS Frames delivered a 2-storey steel frame full build on the roof of the former Peterborough City Council offices at Bayard Plaza, Broadway, forming the penthouse level of a 102-apartment office-to-residential conversion — built through a winter of rain, snow and high winds in 18 weeks. The client was Brightfield Group. The wider scheme converted […]

Steel frame building at the Kingston University project

Kingston University Student Blocks

BAS Frames delivered SFS rooftop extensions and standalone steel kitchen and common room structures across 25 student accommodation blocks at Seething Wells Campus, Kingston upon Thames — completing each block in 2 weeks, with students living on site throughout. Working for Engie over a 24-month programme, each of the 25 blocks was renovated and extended […]

Steel frame building at the Bristol Study Inn student accommodation project

Study Inn, Bristol

BAS Frames delivered a single-storey rooftop full build with CP board external walls at South Plaza, Bristol, in 3 weeks — scheduling every crane lift at weekends to avoid the cost of weekday high-street closures for Dako Construction and Study Inn. Completed in 2018, this was one of the first projects Dako Construction ran as […]

Steel framework erected for Block B at the Slough development

Block B, Slough

BAS Frames delivered a 5-storey building at Grays Place, Slough, combining Steel Frame Systems with structural steel and topped by a stick-built steel pitched roof with individually formed dormer windows — completed in 14 weeks in 2018, with a telehandler as the only lifting plant. Working for 4Square in partnership with Steel Frame Systems, BAS […]

Menu