Infill System

Street elevation of the Harrow High Street development with the SFS frame under scaffold

159 High Street, Harrow

BAS Frames designed, supplied and installed the SFS infill package for a six-storey development at 159 High Street, Harrow, for an overseas developer running their first UK project — delivered ahead of the agreed programme, and followed by an invitation to take on further packages on the same scheme. The client was Greenvista Developments. The […]

Denham Crematorium

Denham Crematorium – Uxbridge

BAS Frames installed over 2,000m2 of SFS and external boarding at The Lea, Denham near Uxbridge, inside a 6-week programme — with a team of just 4 operatives, working entirely from scissor lifts at first-floor level. This is one of the few commercial schemes where the client appointed BAS Frames to deliver the full SFS […]

Steel frame construction on a BAS Frames project

Cross Keys Rooftop Extension

BAS Frames built 8 new flats on the roof of an occupied 6-storey block at Cross Keys, Edmonton N9, using a stick-build steel frame with joists lifted into place by hand — completed in 12 weeks. Cross Keys was the second rooftop extension Forts Group awarded to BAS Frames, following Albany Court in Trenmar Gardens. […]

Structural steel frame interior on a BAS Frames project

Albany Court Rooftop Extension

BAS Frames built a 6-flat rooftop extension at Albany Court, Trenmar Gardens NW10, using a stick-build steel frame assembled in place above occupied flats — completed in 8 weeks with no delivery rejected. Forts Group appointed BAS Frames to add 6 new flats to the roof of an existing residential block in north-west London. Residents […]

Fulham Depot sfs design

Fulham Imperial Road GAS Depot

BAS Frames designed, supplied and installed SFS infill achieving a 120-minute fire rating at the former Fulham Gas Depot on Imperial Road SW6 — double the industry standard, delivered for Erith in 6 weeks. A demolition contractor moving into building works St William acquired and managed the Imperial Road site. The gas depot building itself […]

Completed structural steelwork at the 56 Chatfield Road project in London

56 Chatfield Road

BAS Frames added 4 storeys to an existing residential building at 56 Chatfield Road, Wandsworth SW11, on the bank of the River Thames — working from incomplete architect’s drawings and spotting a scaffold tie clash that would have cost the client significantly if it had been found later. Delivered in 10 weeks. The client was […]

Large structural steel frame at the Bolton project

The Great Wall of Bolton

BAS Frames installed a high-rise SFS acoustic infill system at Lea Field Way, Bolton, separating office areas from military weapons storage in a UK defence warehouse — with 18-metre studs erected by electric hoist from MEWPs, in 8 weeks. Working for Conamar Building Services in partnership with Steel Frame Solutions, BAS Frames handled installation and […]

Structural steel frame construction at the Hathaway House project

Hathaway House, Paddington

BAS Frames delivered the SFS infill package to a 14-storey mixed-use tower and a 4-storey office building on Elmfield Way in west London, working with zero on-site storage and a just-in-time delivery regime, for HG Construction in 2018 over 12 weeks. The scheme combined residential and commercial space in a 14-storey tower alongside a separate […]

Structural steel frame construction at the Finchley school project in London

Morasha School, Finchley

BAS Frames formed all external walls and window openings in SFS around a hot rolled steel frame at Morasha Jewish Primary School in Finchley N3, clad externally in CP board — the complete external envelope delivered in under 3 weeks in 2018. The main structure was built in hot rolled steel (HRS). Our scope was […]