Our Work

Steel Frame Projects

Completed Projects

Every project was evaluated by the utilisation of steel, both from an engineer’s perspective and an architectural one and with a focus on creative ways to meet the needs; the use of new methods of design for areas like connections gravity systems, connections and lateral load resisting systems fire protection and blast aesthetic and visual impact of the project the innovative utilisation of architecturally exposed structural steel; architectural or technical developments in the utilisation of the steel and the application of new designs and construction techniques.

Infill

Cross Keys NEW

Following the successful delivery of Albany Court, Forts Group once again entrusted BAS Frames to construct another rooftop extension—this time comprising 8 flats on top of an existing 6-storey building. This project marked a new milestone for our portfolio, presenting one of the most technically complex designs we’ve encountered to date. The new structure reached almost two additional storeys in height, […]

Albany Court NEW

BAS Frames was appointed to deliver a complex rooftop extension comprising six new flats, constructed using the Steel Frame Solutions stick-build system. Due to strict access limitations and the fact that residents were occupying the floor below, this project required exceptional precision and planning. The nature of the stick-build approach was particularly suited to the constraints […]

Fulham Depot

Case Study: Fulham Imperial Road – GAS Depot The Fulham Imperial Road project presented a unique challenge due to its history as a former gas depot. While the entire site was acquired and managed by St. William, the construction of the GAS depot itself was awarded to Erith, one of Europe’s leading demolition contractors. This […]

Chatfield Road NEW

The 56 Chatfield Road project presented unique challenges compared to other projects like the GAS Depot. While similar in some ways, it was notably different due to its residential nature, being situated on the picturesque River Thames, and the complexity of adding four additional storeys to an existing building. A small family-owned architectural firm led […]

The Great Wall of Bolton

This project presented a unique and complex challenge in terms of installation. Our team was appointed to complete the installation and fully manage the onsite works for this advanced infill system in partnership with Steel Frame Solutions. The scope of works included: Installing insulation between the studs, Fitting two layers of plasterboard, and Adding one layer […]

Hathaway House

The Hathaway House project, completed in 2018 for HG Construction, was a complex and rewarding scheme involving an infill system package that included boarding, vent formation, and brick tie channels. The development featured a 14-storey mixed-use tower combining residential and commercial spaces, alongside a 4-storey office building, and was situated near Paddington Station. One of the most significant challenges of this project was its […]

Finchley

In 2018, we completed a kindergarten project in Finchley, delivering high-quality results on time and within budget. The main structure of the building was constructed using Hot Rolled Steel (HRS), while our team expertly formed the external walls and window openings with Steel Frame Systems (SFS). The infill system was clad externally with CP board, and the entire project […]

Panellised

Perrymount Road

The Perrymount Road project is an ambitious and innovative undertaking. As an 8-storey full-build structure, it stands as one of the tallest standalone buildings completed using Steel Frame Systems (SFS) exclusively. This project will be entirely factory-assembled, with panels delivered directly to the site for rapid assembly. Given the complexity and scale, the design phase […]

Stick Build

Russell Hill

In 2021, we successfully completed a 7-storey full build system for Selsdon Contractors, in partnership with Steel Frame Solutions. The project comprised 54 flats built for Croydon Council, replacing seven detached houses near Purley Station. Our scope of work included the SFS full build system, flooring, boarding, breather membrane installation, and brick tie channels. Despite the challenges, the project was delivered within the agreed 4-month […]

Peterborough

The Bayard Place project involved converting an office building into residential flats, with the SFS package including a two-storey full build on the roof of the existing structure. The new rooftop flats were designed as penthouse maisonettes, adding a unique and luxurious feature to the development. This project presented significant challenges due to tight deadlines and adverse weather conditions, as it was carried out during the […]

Kingston University

Project Overview: SFS Rooftop Extensions and Renovation of 25 Blocks BAS Frames successfully delivered the steel frame system (SFS) rooftop extensions for 25 blocks, each renovated and extended to include modern student bedrooms, a common area, and a shared kitchen. Each block was equipped with new, fully-built steel kitchens and common areas (KCR), designed as […]

Bristol

In 2018, we successfully completed this project for Study Inn and DAKO Construction, showcasing our ability to deliver high-quality results under challenging circumstances. The project involved constructing a one-storey rooftop full build system with CP boards installed across the external walls. Meeting the tight deadline was crucial for our client, and we were proud to exceed expectations. Our team demonstrated exceptional commitment […]

Block B Slough

In 2018, Block B in Slough—a five-storey structure—was completed using an innovative combination of Steel Frame Systems (SFS) and structural steel. Delivered in just 14 weeks, the project demonstrates the efficiency and expertise of BAS Frames in managing complex builds. Scope of Work: Our comprehensive package included: Steel Frame System and structural steel installation External […]

GET IN TOUCH.

In order to get in touch complete the contact form, or see our details below.

Address: 18 Greenacre, Windsor SL4 5LW

Opening times: Mon to Fri – 08:00 – 17:00 Saturday and Sunday and Bank Holidays Closed.

Call: 07463 631303
office@basframes.co.uk

This field is for validation purposes and should be left unchanged.
Name(Required)

Menu