- We built a full-height acoustic infill wall at Lea Field Way, Bolton, separating offices from military weapons storage.
- The studs were eighteen metres — the tallest we have installed — erected from MEWPs inside a working building.
- Eight weeks, for Conamar Building Services.
- It is our strongest acoustic reference, and the reason we treat acoustic separation as an engineering question rather than a board choice.
BAS Frames built the acoustic separating wall at Lea Field Way, Bolton BL5 — an eighteen-metre-tall infill wall dividing office space from military weapons storage, delivered for Conamar Building Services in eight weeks. It is the most demanding acoustic job we have done, and the only completed work we have in Greater Manchester, so this page is built around it.
By Boyan Stanilov, Managing Director, BAS Frames · Published 4 September 2026 · Last updated 13 November 2026

Eighteen-metre studs, installed from MEWPs
Most SFS work is three-metre storey heights repeated many times. This was one wall, eighteen metres from floor to structure, inside an existing industrial building. At that height the stud is not simply a longer version of a normal stud: deflection, buckling and the head detail all become governing calculations rather than standard details, and the wind and pressure conditions inside a large volume are not the same as a partition in a corridor.
The wall was erected from mobile elevating work platforms because there was no scaffold and no crane inside the building. Every section had to be manageable at height by the operatives on the platform, which sets a ceiling on component weight and therefore on how the wall is broken down.
The full detail is on the Lea Field Way project page.

Why the acoustic specification was unusual
The wall separates office accommodation from military weapons storage. That is not a normal adjacency, and it sets an acoustic requirement well beyond the residential separating walls most acoustic drylining is written about.
Performance came from the whole build-up rather than any one component: insulation between the studs, two layers of plasterboard, and a thermal acoustic panel. Mass, cavity absorption and continuity of sealing — and at eighteen metres, continuity is the hard part, because every junction and service penetration over that height is a potential path.
See acoustic drylining for the build-ups and how they are specified to a target rating.
What this job proves that a residential one does not
Approved Document E requires 45 dB between new dwellings, and twin-stud systems reach 55 to 65 dB comfortably. Those are the numbers on almost every acoustic page in this industry, and they describe flats.
Bolton was a different problem: a single very tall element, in an existing industrial envelope, to a specification driven by the use either side rather than by Part E. If your scheme has an acoustic requirement that does not fit the residential template — plant rooms, studios, industrial adjacencies, secure storage — that is the reference worth asking us about.
Bolton and the North West
Bolton is a metropolitan borough of Greater Manchester with a substantial industrial and warehouse stock, which is the building type this job sat in. From here the practical radius covers Greater Manchester and the wider North West — Manchester, Salford, Bury, Wigan, Preston and Warrington.
We mobilise from London, so a North West scheme is a planned mobilisation with accommodation and logistics priced into it. We say that openly rather than implying a local depot we do not have. On an eight-week programme with a settled crew that model works well; on a job needing daily short visits it does not, and we will tell you so.
What we deliver on a North West scheme
Design, supply and installation under one contract: structural calculations, traceable cold-formed sections, and installation with deflection-head, cavity-barrier and cladding-substrate detailing. Infill between the floors of a concrete or steel frame, full builds up to around eight storeys, and specialist single elements like the Bolton wall.
See the SFS package, SFS infill walls and our services.
Fire and compliance
Acoustic and fire performance are usually specified on the same wall, and both belong to the complete tested system rather than to the boards. We install to the certified build-up and hand over the evidence — calculations, fire performance data with certification per wall type, U-values, acoustic data, traceability and a construction control plan.
See fire-rated drylining and passive fire protection.
Getting a price for a Bolton project
Send drawings and the acoustic or fire specification, with the heights and access conditions. For tall single elements the useful information is the structure either side and how the wall is to be reached. We return a fixed, itemised scope with exclusions and mobilisation stated. Contact us.
Related: All locations | Acoustic drylining | Acoustic guide | Main contractors
Related completed work
- Lea Field Way, Bolton BL5 — eighteen-metre acoustic infill wall separating offices from military weapons storage, for Conamar Building Services, eight weeks.
- Fulham Gas Depot, London SW6 — 120-minute fire-rated infill with manufacturer-verified Promat encasement.
- Hathaway House, London W9 — fourteen-storey mixed-use tower delivered just-in-time with no site storage.
Frequently asked questions
Have you worked in Bolton?
Yes. Lea Field Way, BL5 — a full-height acoustic infill wall separating offices from military weapons storage, built for Conamar Building Services in eight weeks with eighteen-metre studs.
How tall can an SFS wall be?
The tallest we have installed is eighteen metres, at Bolton. Above normal storey heights the stud depth, gauge and head detail become specific engineering calculations rather than standard details, and access dictates how the wall is broken down.
What acoustic performance can a steel-framed wall achieve?
Between dwellings, Approved Document E requires a minimum of 45 dB and twin-stud or resilient-bar systems typically reach 55 to 65 dB. For non-residential adjacencies the target is set by the uses either side, and the build-up is designed to it rather than taken from a standard detail.
Do you travel to the North West?
Yes, on a planned mobilisation from London with accommodation and logistics priced into the scheme. That suits a continuous programme with a settled crew, which is what Bolton was. It suits short repeat visits far less well, and we will say so.
Can you install where there is no scaffold or crane?
At Bolton the whole wall was erected from MEWPs inside a working building. Access is settled at design stage, because it sets the maximum component size and the sequence.
Related: where else we work, and acoustic drylining. All our services.
GET IN TOUCH
In order to get in touch, complete the contact form, or see our details below.
Address: BAS CONSTRUCTIONS LTD
35 Redcliffe Close,
London,
SW5 9HY
Opening times: Mon to Fri – 08:00 – 17:00 Saturday and Sunday and Bank Holidays Closed.
Call: 07463 631303
office@basframes.co.uk
RELATED COMPLETED WORK.
Lea Field Way and the tall-stud and infill schemes that sit alongside it.