The Great Wall of Bolton

Technical Installation of High-Rise SFS Infill System

This project presented a unique and complex challenge in terms of installation. Our team was appointed to complete the installation and fully manage the on-site works for this advanced infill system in partnership with Steel Frame Solutions. The scope of works included:

  • Installing insulation between the studs,
  • Fitting two layers of plasterboard, and
  • Adding one layer of thermal acoustic panels for enhanced performance.

Precision Lifting of 18-Meter Studs from MEWPs

The studs, each towering at 18 meters high, required meticulous handling and were erected using an electric hoist. Our team worked from MEWPs (Mobile Elevated Work Platforms), while ground personnel carefully guided the positioning of each stud during lifting—a highly coordinated effort demonstrating exceptional precision and teamwork.

Critical SFS Walls for UK Military Defence Warehouse

Given the project’s importance and tight deadline, our dedicated team extended working hours, including weekends, to ensure successful and timely delivery. This project demanded the highest level of professionalism and commitment, and we are proud to say our team exceeded expectations.

Outcome and Conamar Building Services Commendation

The wall itself played a critical role in separating the office areas from military defence weapons storage, making this an essential part of the UK Military Defence Warehouses. At the conclusion of the project, one of Conamar Building Services’ regional directors expressed heartfelt gratitude and admiration for our team’s dedication and craftsmanship.

GET IN TOUCH

In order to get in touch complete the contact form, or see our details below.

Address: 18 Greenacre, Windsor SL4 5LW

Opening times: Mon to Fri – 08:00 – 17:00 Saturday and Sunday and Bank Holidays Closed.

Call: 07463 631303
office@basframes.co.uk

This field is for validation purposes and should be left unchanged.
Name(Required)

Menu